Name
EE6: Processing and Tracking Your Job Costs in Kinetic
Date & Time
Sunday, August 3, 2025, 1:00 PM - 5:00 PM
Description
Program Level: Beginner
The purpose of this session is to help you understand how your Epicor Kinetic system processes job costs. It examines the components and calculations the application uses as the job moves through the system to create costs. The session describes the job process, evaluates where job estimates are established, and then demonstrates how actual costing data is accumulated through methods of manufacturing to arrive at the final costs for each job record.
Cost: There is an additional $350 fee to attend this session.
Objectives:
- Comprehend the flow of a job through the manufacturing process
- Identify the costing components and calculations used in a method of manufacturing
- Demonstrate the impact of material issues and labor transactions on job costing
- Explain how costing data is accumulated to determine the final cost on each job record
- Describe the impact of material receipts on job and inventory costing
- Monitor costs using the Production Detail, Work in Progress and WIP/Inventory Reconciliation reports through the entire production-to-inventory cycle
Audience: Cost Accountant,, CFO/Controller ,Engineer, Production Planners
Prerequisites: A working understanding of: System Navigation, System flow, Job Management, General Ledger, Engineering
Insights ANZ Solutions
Kinetic
Topics 2025
Inventory and Purchasing, Production